Discussion
Loading...

Discussion

  • About
  • Code of conduct
  • Privacy
  • About Bonfire
Andrew Hunter
@rexbron@mstdn.ca  ·  activity timestamp 2 days ago

Looking forward to the inevitable ‘we can’t run the trains faster because we value engineered the maintenance contract and don’t wanna have to pay extra for it’ #Transit #TTC #Toronto #TOPoli

  • Copy link
  • Flag this post
  • Block
Andrew Hunter
@rexbron@mstdn.ca replied  ·  activity timestamp 2 days ago

Looking forward to the inevitable ‘we can’t run the trains faster because we value engineered the maintenance contract and don’t wanna have to pay extra for it’ #Transit #TTC #Toronto #TOPoli

  • Copy link
  • Flag this comment
  • Block
Andrew Hunter
@rexbron@mstdn.ca replied  ·  activity timestamp 2 days ago

And speaking of line 5, it came out in the meeting that the contracted round-trip time is 98 minutes but will initially be 112.

That is 56min from Kennedy to Mount Dennis.

Taking line 2 and the UP express: 60 min, less with ideal connections.

#Transit #TTC #Toronto #TOPoli

  • Copy link
  • Flag this comment
  • Block
Arthur Gron
@arthurgron@mstdn.ca replied  ·  activity timestamp 2 days ago

@rexbron That's a 20min drive on the highway, off rush hour.

  • Copy link
  • Flag this comment
  • Block
Log in

Bonfire Dinteg Labs

This is a bonfire demo instance for testing purposes. This is not a production site. There are no backups for now. Data, including profiles may be wiped without notice. No service or other guarantees expressed or implied.

Bonfire Dinteg Labs: About · Code of conduct · Privacy ·
Bonfire social · 1.0.0 no JS en
Automatic federation enabled
  • Explore
  • About
  • Code of Conduct
Home
Login